Detailed design, procurement of necessary equipment, construction and commencement of operation of the Natural Gas Compressor Station at Nea Mesimvria of Thessaloniki prefecture. The aim is the upgrade of the natural gas supply capacity of the existing gas pipeline from Nea Mesimvria to Attica with total length of 390km.
Benefits: Improvement of gas flow from North to South, where higher consumption of natural gas is identified. Indirect environmental benefits of using a less polluting fuel in areas where until recently power generation was based on fuel oil.
Budget: €21,393,383